Translations update

Posted on 12 Dec 2017

The popularity of Praxis is growing worldwide and more volunteers are coming forward to translate the framework.The Knowledge and Method sections are now available in Chinese (Mandarin), with the Library being the next section to be uploaded.We are progressing well with the Knowledge section in Bahasa Indonesia and are planning to start on the German translation in the New Year.Other translations are in the pipeline. We are close to reaching 30% of the world's population in their first language and half the world's population in their first or second language.The Praxis Framework is ... Read more.


Nouvelle traduction en français

Posted on 13 Jul 2017

Praxis Framework est maintenant disponible en françaisMerci beaucoup à la SMaP pour la traduction. Connaissances Méthode Compétences Maturité Bibliothèque Contexte Processus Gestion Capacité Encyclopédie Gestion Documentation Processus Maturité ... Read more.


Comparative glossary update

Posted on 02 Feb 2017

The latest version (1.3) of the Praxis Comparative glossary is now available to download. This version includes terminology from the Project Management Institute's Standard for Program Management cross referenced to Managing Successful Programmes from Axelos and Praxis.Please note that the PDF version is 1.3 but the on-line pages are being updated and remain at version 1.2 until all pages are ready to upload.Click here to download ... Read more.


Back to top

About Praxis


Praxis is a free framework for the management of projects, programmes and portfolios. Praxis brings together a body of knowledge, methodology, competence framework and capability maturity model in a single integrated framework with a single structure and terminology. No more need for mapping and translation between different guides.

Visit the home page to learn more about the Praxis Framework.