Title | Author(s) | Notes | Provided by |
|---|---|---|---|
As we seek to manage risk effectively, questions of cost also arise since risk management is not free. There is no “zero-cost option” for risk management. | |||
Kozak-Holland | In The Great Escape cost was measured in labour but without a monetary value. One of the assets of the escape project was the availability of human labour and the prisoners’ willingness to work. | ||
Pritchard | Different organizations have different expectations for cost estimates. Some see them as flexible glances into a crystal ball of what might be. Others see them as the future, carved immutably in mystic runes in ancient granite unchanged and unchanging. |
Back to top
Documents
All documents are provided by Praxis unless otherwise stated.
Title | Notes | Provided by |
|---|---|---|
An infographic showing some of the key steps at capability levels 1 to 3 |
Back to top
External resources
These links are correct at time of publication. Please let us know via the comments button at the top of this page if resources are no longer available. Our library pages are updated regularly - if you would like to recommend additional free resources please use the 'contact us' tab or the comment button.
| Title | Source | Format and length | Notes |
|---|---|---|---|
GAO1 | PDF; 440 pages | An extensive guide to 'best practice' in cost estimating and control. Also includes material on earned value, sensitivity analysis and the use of work breakdown structures. | |
UKNOS2
| PDF; 6 pages | Two sample competency definitions from the UK National Occupational Standards (NOS). For more examples search for 'project cost budget' here | |
PDF; 5 pages | |||
FME3 | PDF; 57 pages | An guide to developing and controlling a budget. Also includes chapters on contract management and payment methods. | |
20124 | PDF; 2 pages | An overview of how final cost forecasts were managed for the London Olympics |