定义明确的委托目标的几个特征的首字母缩略词。几个字母分别代表:
- Specific: 具体性
- Measurable: 可衡量性
- Achievable: 可实现性
- Realistic: 现实性
- Time-constrained: 时效性
很多专家将缩略词扩展到SMARTER,增加了:
- Ethical: 伦理道德性
- Recorded:可记录性
定义明确的委托目标的几个特征的首字母缩略词。几个字母分别代表:
很多专家将缩略词扩展到SMARTER,增加了:
Please consider allowing cookies to be able to share this page on social media sites.
Change cookie settings| 2nd September 2014 | Link to Italian page added |